News Article

Wildcat begins sea trials with Iron Duke

An Equipment and Logistics news article

12 Jan 12

Wildcat, the Navy's next-generation helicopter, has begun its most extensive trials yet, joining a frigate at sea for the first time.

A Wildcat helicopter

A Wildcat helicopter takes off from the flight deck of HMS Iron Duke
[Picture: Crown Copyright/MOD 2012]

The successor to the trusty Lynx, which has served the Navy and the Army admirably since the 1970s, will spend the next month flying on and off HMS Iron Duke in the English Channel as part of its most extensive trials yet.

Wildcat is the next generation of light multi-role helicopter to serve both the Army and the Navy in the future. The Navy variant of the Wildcat will be the mainstay of helicopter operations from Royal Navy destroyers and frigates, with 28 ordered for the Fleet Air Arm.

Although the aircraft looks similar to its predecessor - with the exception of its distinctive tailplane which improves the helicopter's stability - Wildcat's characteristics are sufficiently different from Lynx to warrant extensive flight trials, setting the parameters within which it can safely operate.

Wildcat has gone to sea before, landing on the back of aviation training ship RFA Argus off the south coast of England back in November 2011.

A Wildcat helicopter leaves HMS Iron Duke

A Wildcat helicopter takes off from the flight deck of HMS Iron Duke
[Picture: Crown Copyright/MOD 2012]


And the prototype ZZ402 paid a brief visit to HMS Iron Duke just before Christmas, when pilots and technicians tested some of the basics.

Those trials were carried out with the ship stationary in Portsmouth Naval Base. For the 'Ship Helicopter Operating Limits' trials currently underway, Iron Duke and Wildcat have put to sea.

A team of more than 30 experts has joined the Type 23 frigate for the evaluation; the ship has also been fitted with specialist instruments to record every aspect of the trials.

Initially the trials will take place in Lyme Bay, before Iron Duke sails increasingly westwards, not least searching for rough weather to help define the helicopter's operating limits 'over the full envelope of operations' (i.e. payloads and weights carried by Wildcat in all manner of climatic conditions).

The trials should take until around early February 2012 after which around nine months is required to analyse and evaluate all the information gathered.




Defence Equipment & Support

DE&S News

News from the Defence Equipment and Support

MOD team to examine WWII wreck in South Atlantic

A Defence Equipment and Support (DE&S) team is heading to the South Atlantic to...

12 Apr 12

Huge sections of new Navy carrier joined together

One of the two biggest warships ever built for the Royal Navy has taken another...

11 Apr 12

HMS Defender sails through second sea trials

The fifth of Britain's Type 45 destroyers is getting closer to being taken in to...

10 Apr 12

RAF laser-guided bomb contract secures hundreds of UK jobs

A £60m deal announced today for extra RAF precision munitions will help sustain...

3 Apr 12

HMS Vigilant sets sail after refuel and upgrade

Royal Navy submarine HMS Vigilant sailed from Plymouth on Tuesday, 27 March,...

29 Mar 12

More DE&S stories

Visit the DE&S site

Page rated 3 times
This page has an average rating of 4/5



 

RSS Feeds

Equipment and Logistics Equipment and Logistics  
Royal Navy Royal Navy  
Defence Equipment and Support Defence Equipment and Support