News Article

Rapid partnership paves way for superior air support in Afghanistan

An Equipment and Logistics news article

6 Dec 07

An unprecedented response to an Urgent Operational Requirement has seen front line troops in Afghanistan benefit from superior levels of close air support within four months of the contracts being signed.

A Harrier GR9A taxis for take off at Kandahar Airfield [Picture: ISAF]

A Harrier GR9A taxis for take off at Kandahar Airfield
[Picture: ISAF]

Harrier GR9A aircraft in Afghanistan are now equipped with a GPS-enhanced version of the 1,000lb Paveway laser guided "smart" bombs.

In response to an Urgent Operational Requirement (UOR) for better aerial support in theatre, representatives from BAE Systems and the MOD met key suppliers in the United Kingdom and America and in just 10 days contracts were exchanged.

This new GPS precision guided weapon was developed by joining the body from a UK Paveway 2 and the Enhanced Computer Control Group from a Paveway 4.  The hybrid weapon provides the GR9A with an integrated, through cloud, precision bombing capability.

The programme has been delivered through key partnerships between BAE Systems, the MOD, Raytheon Missile Systems, Portsmouth Aviation Limited and EDO-MBM, and involved integration of the new weapon, rig test, flight trials, weapon performance analysis and certification.

BAE Systems issued the Design Authority Operational Emergency Clearance Advice early, allowing evaluation and release-to-service within the UOR requirements. The strength of the partnerships has enabled this significant capability to be deployed in theatre four months from contract exchange.

"This co-operation has provided a significant increase in the military capability of our forces in operations."

Air Commodore Ian Thorne

Air Commodore Ian Thorne, Harrier, Jaguar and Survival Integrated Project Team leader, said:

"This represents a remarkable achievement in the delivery of this UOR given that the programme started in May 2007.

"Indeed, the project would have been unachievable without BAE Systems levering their considerable weapon integration and project management skills into this demanding endeavour.

"The IPT appreciates the efforts from BAE Systems that have made this programme a success, this co-operation has provided a significant increase in the military capability of our forces in operations."

BAE Systems' Andy Lavin, head of Harrier Aircraft Capability, said:

"Delivery of this capability has required all stakeholders to work together with a strong partnership being established.

The enhanced smart bombs have been a boost to the Harrier GR9A's close air support capabilities [Picture: DE&S]

The enhanced smart bombs have been a boost to the Harrier GR9A's close air support capabilities
[Picture: DE&S]

"It is clear that, as the MOD and industry move towards a closer working relationship under the terms of the Defence Industrial Strategy, we can achieve more working together than we can individually – an important lesson as we move ever closer towards full availability contracting."

Raytheon's director of Precision Systems, Tobin Touchstone, added:

"The speed in bringing this capability to the front line is a testament to the excellent working relationship and edication of all stakeholders involved in the programme.

"The modular design of RSL's Paveway 4 and the early risk mitigation through common guidance algorithm development allowed the rapid integration of the Paveway IV Guidance Section with the UK 1,000lb Enhanced Paveway 2 and the Harrier GR9 platform."

This article first appeared in the December 2007 issue of Preview magazine - For Defence Equipment and Support, The Equipment Capability Customer and industry.

DE&S News

News from the Defence Equipment and Support

MOD civil servant honoured for work on Joint Combat Aircraft

A Ministry of Defence civil servant has been honoured by both the United States...

4 Feb 10

UK forces' light weaponry showcased at MOD HQ

The latest developments in the wide range of light weapons available to British...

29 Jan 10

A400M success ushers in a new era for tactical airlift

Officials at DE&S have described the first flights of the A400M transport...

26 Jan 10

Soldiers discuss with minister new kit bound for Afghanistan

Recently returned from operations in Afghanistan, soldiers from 2nd Battalion...

22 Jan 10

First upgraded Lynx helicopters are back in service

The first four upgraded Lynx Mk9 helicopters, which are to be sent to...

19 Jan 10

More DE&S stories

Visit the DE&S site

Operations in Afghanistan

Corporal Johnathan Moore and Private Sean McDonald killed in Afghanistan

It is with sadness that the Ministry of Defence must name Corporal John Moore...9 Feb 10

The challenges of mentoring the Afghan National Army

Through mentoring, 2nd Battalion The Yorkshire Regiment (Green Howards) [2...9 Feb 10

Soldier from 36 Engineer Regiment killed in Afghanistan

It is with sadness that the Ministry of Defence must confirm that a soldier from...9 Feb 10

Ainsworth sets out risks and benefits of Operation MOSHTARAK

People should be prepared for British casualties resulting from the upcoming...8 Feb 10

Read more Afghanistan stories

See all In Depth stories

Page not yet rated
This page has an average rating of 0/5