Project: Floor Plate lighting
Expected CO2 saving: 215t approx
Comment: Altering the setting to the light sensors so that fewer lights are switched on and reducing the time that the lights are activated down to 30 minutes.
Project: Unoccupied Area Lighting
Expected CO2 saving: 20t approx
Comment: Reduced light levels down to 25%
Project: Unoccupied Area Equipment
Expected CO2 saving: 142t approx
Comment: Removal of all electrical equipment from unoccupied areas
Project: Christmas closedown
Expected CO2 saving: 85t approx
Comment:Closedown all non-essential equipment during the season break
Project: Lifts
Expected CO2 saving: 95t approx
Comment: Closedown of 6 lifts between Friday evening and Monday morning and reduce number lifts during the week
Project: Chiller Plant
Expected CO2 saving: 550t approx
Comment: Reducing operating times of chiller plant
Project: Hydro boilers / Chill Water Taps
Expected CO2 saving: 12t approx
Comment:Replace 'hydro boilers' and chilled water taps with a single more energy efficient model
Project: Fan Coil Units
Expected CO2 saving: TBC - to be implemented
Comment:Reduce times (or switch off if possible) any localised cooling units
Project: Enhanced Power Supply Management
Expected CO2 saving: TBC, but potentially signicant
Comment: Reports to be submitted
Project: Staff Behaviour (switch off IT, take the stairs, turn off the lights etc)
Expected CO2 saving:
Comment: A number of communication methods have been used to engage staff, invite suggestions and help make savings. Methods include building wide emails, information stands, use of MOD Intranet and 'Town Hall' style briefings.